Saturday, August 19, 2006

Finishing Touches

Finishing touches are underway. We've started moving in, but are having to wait on some things because of finishing the floor, for example. Bathroom mirrors and shower stall doors will be installed next week. Some new furniture is being delivered this coming week, too, as well as the refrigerator and range. The painting is done, the carpet is installed. It's definitely feeling like a house that's ready for occupants. We do have our certificate of occupancy already--Yay!
Congrats to our builder, Matt Montgomery!
Flower box under the office window.






The kitchen windowbox.



Looking out through the kitchen window--nice to see the flowers peaking up.

Thursday, August 10, 2006

Hardware time


Hardware has been installed on doors. And notice how shiny the floor is--it's been sealed. It'll get more coats, but just this step makes a tremendous difference.

Front door with dentil shelf installed, new hardware, house numbers and doorbell button.

Wednesday, August 09, 2006

Evening at Zollner Lane



A little light on the subject.

Sunday, August 06, 2006

The Polkameister with his Weltmeister!

Well, here it is... Paul with his flashy new squeeze box. Aren't they a pair?! It's a 4-year-old Weltmeister with a terrific folk sound and look, besides being 14 pounds lighter than his old accordion. Now Paul can be a happier wanderer on stage.

Thanks to all who pitched in on this great gift for Paul's 50th.

Friday, August 04, 2006

Morning at Zollner Lane


Powder Rm pedestal sink.

Master Bath twin sinks, backsplash done.
Spa tub deck finished, fixtures in place.
Kitchen's coming along.

View of Living Rm from balcony.
Upstairs bathroom.

Looking from Kitchen to Living Room.

Thursday, August 03, 2006

Sinks and faucets, electrical outlets, switches and fixtures, coming along...

Garage mechanical area is filling up--water softener (lower left), fire sprinkler system on the wall at left (orange), pressure pump for water system (on little shelf), water heater (in the middle), recirculator pump between water heater and furnace.

Laundry Rm sink, counter and tile backsplash--muddy yet from grout.

Kitchen sink, garbage disposal, dishwasher, microhood, tile backsplash and electrical outlets/switches.
Light fixtures are going in. Here's the Living Room chandelier.
Dining Rm chandelier.
Carriage light next to big garage door.